CGM Extended Grid Connection Study

Extended Grid Connection Study, November 2024
CGM Extended Grid Connection Study
Luongo Manganese Mine Tour with Prospective EPC Bidders
Luongo Manganese Mine Tour with Prospective EPC Bidders

CGM and Prospective EPC Contractors for the Chipili Phase 1 50MW Scaling PV Solar Plant tour Musamu’s Luongo Manganese Mine in Chipili District. The visit explored the mine’s potential as a power offtaker and the mine’s energy needs. November, 2024